GE Maintenance Solutions (GEMS) specialises in Water and Wastewater asset management, offering services that encompass project management, mechanical maintenance, maintenance planning, steel fabrication, pump services, and more.
We actively support local community initiatives and have a strong record of successful completed projects in our portfolio.
GEMS has extensive experience with the installation, maintenance, and overhaul of all types of Screening systems for STP Inlets. Whether it be onsite maintenance or complete overhauls in the workshop, we have the skills and experience to get the best life out of any Screening system.
We work with Band Screens, Screw Conveyor Screening systems, Drum Screens, both inclined and horizontal, and all types of Screw Compactors.
Recently, GEMS personnel have been involved with the measurement, design, and installation of new Band Screens for two plants to ensure that the Screens could be installed and removed without entry to the Inlet chambers.
View our most recent Water & Wastewater Treatment projects.
CANNONVALE STP MEMBRANE REPLACEMENTS
GEMS was engaged by Veolia to replace the membranes at Cannonvale STP and install new ones.
Our scope was to fabricate 12 x stainless membrane frames, fabricate new aeration pipework, supply labour, cranes, scaffolding, and equipment to install the new membranes.
Also included was the dismantling and disposal of the old membranes.
YEPOON STP MEMBRANE WORKS
GE Maintenance Solutions was engaged to swiftly handle the installation of three new membranes and execute warranty repairs on existing ones at the Yepoon Sewage Treatment Plant (STP).
This urgent project, inspired by GEM's successful membrane replacement work at the Cannonvale STP, required meticulous planning and execution within a tight 21-day timeline, involving material procurement, stainless steel frame fabrication, bracket installation, core drilling, and membrane replacement.
MNWRF SBR Mixer Stairs & Mixers
GEMS was engaged by Mackay Regional Council (MRC) to fabricate 4 x sets of access stairs, install the stairs to the Sequencing Batch Reactor (SBR) walls at Mackay North Waste Recycling Facility (MNWRF).
This inluded set up, installation and commissiong of six new Mixers and Davits into the 2 x SBR’s.
GE Maintenance Solutions (GEMS) actively supports local clubs, events, and charitable organizations.
See how we are actively involved in helping our local community:
Based in Mackay, and servicing all of Queensland.
Contact us today to discuss your Water & Wastewater Treatment project requirements.